Site Activities

In order to better serve our clients’ needs, Pidemco actively supports clients at their sites with services like inspection, repair, erection, overhaul and commissioning. Our agile teams, experienced and familiar with site conditions, are highly equipped to respond to wide range of site activities. Our personnel while trained, strictly follow HSE regulations.

Read More +

Fixed Equipment

Our work scope for fixed equipment at site involves:

1 - Finishing and final assembly at site for huge equipment

Huge equipment (Convertors, Towers, stacks…) which introduce difficulties in transportation, Pidemco can offer to fabricate equipment in manageable modules and in site assemble them together. We have lots of experience in this area and provide our economically advantageous solutions to our clients.

2 - Erection and Installation at site for Towers, Stacks or other Heavy equipment

We are very experienced to erect and install Towers, Stacks and other heavy equipment on their foundation at the site which requires special care and expertise. We have been working with reputed transportation and rigging companies and has installed or supervised many of equipment fabricated by us during last two decades.

3 - Installation of Tower internals, Refractory Lining & Ladder & Platforms

We install Internals of Towers and process equipment, Ladder & Platforms which are supplied or fabricated by us at the site and after erection of the main equipment. Also, by cooperation of our joints, we supply, install and cure all kinds of refractory linings at site.

 

Our biggest deliveries include the 90 meters stack for South Pars Gas Refinery, Phase 12 in south of Iran which was manufactured in 9 pieces and installed and erected in site.

Other important project was manufacturing the 650 tons SO2 to SO3 convertor for Sarcheshmeh Sulfuric Acid Plant, Kerman, Iran. In this project we prefabricated almost 6000 parts in our shop and send subassemblies to the site location and finished the final assembly and welding of this huge stainless steel reactor.

 

Fixed Equipment

Site activities for Fixed Equipment

Surface Condenser - ready to be installed at Amirkabir Petrochem. Plant

Installation of 7.5 meters diameter Tube bundle to Convertor, Acid Sulfuric Plant - Sarcheshmeh, Kerman

Fabrication & Installation of Acid sulfuric Equipment - Sarcheshmeh, Kerman

Transportation of 90 m Stack parts to its site location

Fixed Equipment
Fixed Equipment
Fixed Equipment
Fixed Equipment
Fixed Equipment
Rotary Equipment

Pidemco field forces provide comprehensive range of field services. Our technical advisers, supported by disciplined technicians with necessary skills and experience can meet all of our customer requirements.These include:
- Technical support
- Installation and Commissioning
- Inspection and machinery overhaul 
- Troubleshooting and maintenance
- Refurbishment and rehabilitation
- Relocation and re-commissioning
- Field balancing and vibration analysis

Rotary Equipment

Site activities for Rotary Equipment

Lorem ipsum dolor sit amet, cu autem legere petentium 2

Lorem ipsum dolor sit amet, cu autem legere petentium 2

Rotary Equipment
Rotary Equipment
Rotary Equipment

Featured Projects

ISOMAX Tower - Tehran Refining Co.
ISOMAX Tower - Tehran Refining Co.

Design, Fabrication and installation at site

Disk & Donut Heat Exchangers - Acid Sulfuric Plant
Disk & Donut Heat Exchangers - Acid Sulfuric Plant

Design, Fabrication and installation of vertical gas coolers of up to 200 tons.

90m stack - Phase 12 SPGC
90m stack - Phase 12 SPGC

Design, Fabrication and installation of 90 meters stack for SPGC Phase 12.

SO2 to SO3 Convertor - Acid Sulfuric Plant
SO2 to SO3 Convertor - Acid Sulfuric Plant

Design, Fabrication and installation of recirculating type SO2 to SO3 convertor